Shri Shyam Sunder Agrawal began his career as a Partner in M/s D. R. Agrawal & Co. founded by his Elder Brother Shri Dinesh Chandra Agrawal.
Undertook the Work of Rising Main (4kg – 6kg) Pressure of RCC Pipes and succesfully supplied water from Deesa to a Village in Tharad.
Carried out the Manufacturing of PVC Pipe upto 400 mm dia. in the name of Gupta Plastic Industries.
Set up a Mini Cement Plant on the name of Tirupati Cement Industries at Deesa.
Manufactured Mosaic tiles in the name of Agrawal Tiles Industries at Deesa.
Setup India’s first Vertical Pipe Casting Unit and manufactured 1400 – 2200 mm dia. RCC Pipes on the name of Agrawal Pipe Industries at Deesa.
Successfully comissioned 32 MLD STP at Nadia based on Aerated Lagoon Technology.
Constructed Water Treatment PlantS of 36 MLD & 32 MLD capacity in the name of M/S D. R. Agrawal & Co.
Shri Shyam Sunder Agrawal founded Laxmi Construction a “AA” Class Govt. Contractor.
Set up an RCC Pipe Manufacturing Facility at Gojaria, Dist. Mehsana, equipped with all Testing Facilities.
Pioneered in Setting up India’s Largest dia. Pipe Casting Facility with Centrifugal Spinning Process RCC Pipes with dia. of 2000 to 2200 mm in the name of Laxmi Pipe Industries.
Successfully executed Main Trunkline work for Sewerage Works of West Zone of Ahmedabad and laid 2200 mm dia. RCC Pipeline beside Sabarmati River using Well Point System for Depth upto 15 meters with top width of 50 meters approximately.
Undertook Several Canal Lining Works for Command Area Development (CAD) for Minors and Sub Minors for 410 kms.
Undertook and successfully completed several Projects for Providing and Laying Main Trunk Sewer Line for Ahmedabad Urban Development Authority (AUDA)
Successfully commissioned several works of providing and laying of 2200 mm dia. NP 4 Class Pipes for Ahmedabad Urban Development Authority (AUDA)
Commissioned Several Packages Under JnNURM Programme of Providing and Constructing Sewer Lines for Ahmedabad Municipal Corporation (AMC)
Laxmi Pipe Industries received BIS certification.
Successfully Commissioned an Underground Drainage Project and Laid the network of more than 200 Kms of Pipeline.
Set an Unperceivable Benchmark of laying more than 1600 kms of network in 2 years time.